FPP Versalift In Tight Squeeze To Ingress Plant Room Equipment Into The Basement At The New Birmingham Library
We were invited to tender by Cofely Industrial Energy to provide Managed Contract lifts over a number of visits to ingress and place 2 – Boilers 11,000kg each, 1 – CHP Engine 9,200kg, 3 – Trane chillers 9,600kg each and 1 Thermax Chiller 5,500kg to positions within the basement plant room of the New Birmingham Library.
This was an exceptionally challenging site amidst Centenary Square one of the busiest area’s in the City and, like many, had a challenging construction programme to deliver against.
Access to the site was severely restricted, steel road plates were deployed to protect the pedestrian walkway and significant shoring up of the underside of the boiler house floor was carried out in order to withstand the axle loadings imposed by the Versalift rigging truck.
With each item stripped of its auxiliary components, our 40-60 Versalift was just able to complete each lifting operation into the basement plant room utilising special ‘low headroom’ spreader beams designed and procured by us during the planning phase for the job.
In developing a safe system of work coupled with the specific skills and capabilities of the install team we once again demonstrated that we are well versed in the requirements needed to deliver for our customers.
Recent Articles
During a recent project aimed at upgrading the Boiler house at the Mondelez Marlbrook site, Factory Plant Projects executed a comprehensive turnkey removal and installation operation.FPP’s approach entailed a strategic…
Read MoreFPP has successfully executed projects for numerous microbreweries across the United Kingdom. Our track record demonstrates our proficiency in operating within constricted access areas while maintaining a steadfast commitment to…
Read MoreFactory Plant Projects executed a plant room tank installation on a bustling construction site in Leeds. Collaborating closely with the principal contractor and our client, FPP adeptly orchestrated the seamless…
Read MoreIn collaboration with a highly esteemed and long-standing customer, FPP successfully executed the installation of the new De-Alc plant at Camerons Brewery. This project constituted a pivotal component within a…
Read MoreFPP was contracted to conduct the lifting operations for a state-of-the-art precious metal recycling facility. Leveraging the capabilities of the electric pick & carry crane, FPP executed a diverse range…
Read MoreFPP was selected as the designated contractor entrusted with carrying out the intricate task of a staged relocation of our client’s equipment, all while sustaining uninterrupted operational continuity. In the…
Read More